CONNECTION WORKS BETWEEN THE QUAY HIGH SEABEDS OF THE PORT OF SAVONA AND THE CABLEWAY LINES IN “SAN ROCCO”

Jacking pipe DN/ED 2500/3000 – Pipe length 2.35 m – Section length approximately 1080 m

With the microtunneling it was possible to remove the old ship unloading station and to carry out an underground connection between the new quay of the industrial port and the new unloading station in San Rocco. In order to comply with the project requirements, a plan was outlined with bends both horizontal and vertical and with a 20% slope in the final section.

Main Purchaser: the town Council of Savona – Funivie – Società Funiviaria Alto Tirreno Transports Sector.