As far as the methane pipeline is concerned five microtunnels were built for a total of 2915 m in order to cross areas particularly difficult from an environmental and landscape point of view. The ILCEV prefabricated pipe was used as a sheathing pipe for the following fitting of the 48” steel line pipe.
Main Purchaser: SNAM RETE GAS
Manufactured product | Building Site | Section length |
---|---|---|
Jacking pipe DN/ED 2000/2400 L=3m | Tarvisio Valbruna | 600 mt |
Jacking pipe DN/ED 2000/2500 L=3m | Tarvisio Leila | 600 mt |
Jacking pipe DN/ED 1600/1940 L=3m | Tarvisio Rio Sciarpa | 135 mt |
Jacking pipe DN/ED 2000/2400 L=3m | Tarvisio Coston Tedesco | 480 mt |
Jacking pipe DN/ED 2400/3000 L=3m | Tarvisio Lussari | 1100 mt |